Twin Turbine Offloading Project

Posted by on Jan 10, 2013 in Dunkelbros | No Comments

Dunkel Bros. received and offloaded two turbines (crates) at approximately 140,000 lbs each. These two loads came in on 9 axle trailers with escort vehicles and required special routing through each city because they were each over-dimensional and very heavy.Loads like this cannot travel the same routes that regular vehicles travel to get from one point to the next. Once at Dunkel Bros., they were offloaded and placed into storage. These pieces will eventually be loaded out again and shipped overseas to China.

pic1

pic2

pic3

pic4

pic5

pic6

Leave a Reply